Project Description
This project involves the replacement of deteriorated sidewalk or curb. Eligible sidewalks must have significant cracking or spalling or have a joint separation of 1" resulting in a trip hazard.
Eligible curb must have significant distresses that result in impeding proper roadway drainage. Curb will not be replaced due to minor spalls or cracks or to solely remove a driveway "hump".
Each year an area of the City is targeted for active survey of sidewalk condition. We will also address deficient sidewalk on a City wide basis after being notified of a specific location and verification that it meets replacement criteria. Curb is replaced on an as notified basis. If a street is targeted for rehabilitation in the near future, curb replacement may wait until the entire street is improved.
Project Schedule
This year, the city has selected BG Concrete to complete this year’s concrete project. Their expected start date is the end of July/beginning of August.
Contact Information
This project is managed by Elton Orozco, Civil Engineer. Questions regarding the project can be directed to him at (630) 232-1501 or corozco@geneva.il.us .