City of Geneva Residential, General Service and Industrial
Electrical Rates
| *All units $/kWh unless otherwise noted |
May 07 |
April 08 |
| |
Summer |
Winter |
Residential Service Rate |
| Energy Charge |
0.03637 |
0.03637 |
| Demand Charge |
0.03580 |
0.01837 |
| Transmission Demand Charge |
0.01041 |
0.01041 |
| Distribution Charge |
|
|
| First 500 kWh, per kWh |
0.02034 |
0.01646 |
| Over 500 kWh, per kWh |
0.00547 |
0.00456 |
| Total Energy Charges |
|
|
| First 500 kWh, per kWh |
0.10292 |
0.08161 |
| Over 500 kWh, per kWh |
0.08805 |
0.06972 |
| Customer Charge, $/Bill/Mo. |
$6.55 |
$6.55 |
| |
|
|
Space Heat Rate |
| Energy Charge |
0.03637 |
0.03637 |
| Demand Charge |
0.03580 |
0.01837 |
| Transmission Demand Charge |
0.01041 |
0.01041 |
| Distribution Charge |
|
|
| First 500 kWh, per kWh |
0.02034 |
0.01646 |
| Over 500 kWh, per kWh |
0.00547 |
0.00456 |
| Total Energy Charges |
|
|
| First 500 kWh, per kWh |
0.10292 |
0.08161 |
| Over 500 kWh, per kWh |
0.08805 |
0.06972 |
| Customer Charge, $/Bill/Mo. |
$6.55 |
$6.55 |
| |
|
|
General Service Rate - Demand Less than 25 kW |
| Energy Charge |
0.03636 |
0.03636 |
| Demand Charge |
0.03330 |
0.01610 |
| Transmission Demand Charge |
0.00925 |
0.00925 |
| Distribution Charge |
|
|
| First 500 kWh, per kWh |
0.02476 |
0.02005 |
| Over 500 Kwh, per kWh |
0.00665 |
0.00555 |
| Total Energy Charges |
|
|
| First 500 kWh, per kWh |
$0.10368 |
$0.08176 |
| Over 500 Kwh, per kWh |
$0.08556 |
$0.06727 |
| Customer Charge, $/Bill/Mo. |
$13.10 |
$13.10 |
| |
|
|
Medium General Service - Demand greater than 25 kW, but less than 400 kW |
| Energy Charge |
N/A |
N/A |
| Supply Charge |
0.03462 |
0.03462 |
| Losses @ 5% |
0.00173 |
0.00173 |
| Total Energy Charge |
$0.03635 |
$0.03635 |
| |
|
|
| Demand Charge |
|
|
| Supply Charge - Non Transmission |
$9.50 |
$4.69 |
| 4.69 Transmisssion |
$2.67 |
$2.67 |
| Distribution |
$4.07 |
$4.07 |
| Total Demand Charge, per kW |
$16.24 |
$11.43 |
| Customer Charge, $/Bill/Mo. |
$47.63 |
$47.63 |
| Minimum Bill = Customer Charge + Demand Charge |
|
|
| |
|
|
Large General Service - Demand greater than 400 kW, but less than 2,000 kW |
| Energy Charge |
N/A |
N/A |
| Supply Charge |
0.034910 |
0.034910 |
| Losses @ 4% |
0.001400 |
0.001400 |
| Total Energy Charge |
0.036310 |
0.036310 |
| |
|
|
| Demand Charge |
|
|
| Supply Charge - Non Transmission |
$9.31 |
$4.42 |
| Transmission |
$2.55 |
$2.55 |
| Distribution |
$4.23 |
$4.23 |
| Total Demand Charge, per kW |
$16.09 |
$11.20 |
| Customer Charge, $/Bill/Mo. |
$77.39 |
$77.39 |
| Minimum Bill = Customer Charge + Demand Charge |
|
|
| |
|
|
Large Industrial Rate - Demand greater than 2,000 kW |
| Energy Charge |
N/A |
N/A |
| Supply Charge |
0.03523 |
0.03523 |
| Losses @ 3% |
0.00106 |
0.00106 |
| Total Energy Charge |
0.03629 |
0.03629 |
| |
|
|
| Optional Time of Day Energy Charge |
|
|
| Supply Charge |
|
|
| On-Peak |
0.4446 |
0.4446 |
| Off-Peak |
0.02844 |
0.02844 |
| Losses @ 3% |
|
|
| On-Peak |
0.00133 |
0.00133 |
| Off-Peak |
0.00085 |
0.00085 |
| Total Time of Day Energy Charge |
|
|
| On-Peak |
$0.04579 |
$0.04579 |
| Off-Peak |
$0.02929 |
$0.02929 |
| |
|
|
| Demand Charge |
|
|
| Supply Charge - Non Transmission |
$8.69 |
$3.70 |
| Transmission |
$2.22 |
$2.22 |
| Distribution |
$3.57 |
$3.57 |
| Total Demand Charge, per kW |
$14.48 |
$9.49 |
| Customer Charge, $/Bill/Mo. |
$136.93 |
136.93 |
| Minimum Bill = Customer Charge + Demand Charge |
|
|
Power Cost Adjustment Clause: Energy charges for the current month shall be adjusted by the amount of a power cost adjustment factor to reflect the preceding calendar month's cost of power as compared to a base cost as described below.
Power Cost Adjustment Factor = PCAF= Fm/Sm - $0.05491/kWh
Where Fm = the cost of power in the preceding calendar month includes:
A. The cost of power from Exelon Generation Company, LLC ("Exelon") and WM Illinois
Renewable Energy, LLC ("BEP").
B. The charges and credits as billed or credited by PJM.
C. Charges for fuel actually used at GGF.
D. Charges for transportation of fuel used at GGF.
E. Other Variable GGF Expenses charged to accounts 20-68-001 -120,20-68-001 -230 and
20-68-001-355.
Where Sm = All kWh retail sales for the preceding billing month.
SECTION TWO: That the following Power Cost Adjustment Clause be and the same is hereby added to the Section 9-1A-6 (Residential Rates), Section 9-1A-7 (Residential Space Heating Rate [8 Months Heating Season Rate for Existing Customers], Section 9-1A-8 (General Service Rate), Section 9-1 A-10 Medium General Service Rate) and Section 9-1 A-11 (Large General Service Rate) of Chapter 1 of Title 9 of the Geneva City Code:
"Power Cost Adjustment Clause: Energy charges for the current month shall be adjusted by the amount of a power cost adjustment factor to reflect the preceding calendar month's
cost of power as compared to a base cost as described below.
Power Cost Adjustment Factor = PCAF= Fm/Sm - $0.05491 AWh
Where Fm = the cost of power in the preceding calendar month includes:
A. The cost of power from Exelon Generation Company, LLC ("Exelon") and WM Illinois Renewable Energy, LLC ("BEP").
B. The charges and credits as billed or credited by PJM.
C. Charges for fuel actually used at GGF.
D. Charges for transportation of fuel used at GGF.
F. Other Variable GGF Expenses charged to accounts 20-68-001 -120, 20-68-001 -230 and 20-68-001-355.
Where Sm = All kWh retail sales for the preceding billing month."
SECTION THREE: That Paragraph D of Section 9-1 A-13, Chapter 1 of Title 9 of the Geneva City Code be and the same is hereby amended by substituting the following therefor:
Section 9-1A-13: METER READING AND BILLING:
D. Delinquent Bills: Where billings in the amount of less than Fifty ($50.00) Dollars remain delinquent and unpaid for a period of two (2) consecutive months, or where billings in excess of Fifty ($50.00) Dollars remain delinquent and unpaid for a period of Thirty (30) days, the Finance Director shall order service discontinued to the delinquent customer's premises. In the event service is discontinued due to such delinquency, an Administrative Fee of Seventy-Five ($75.00) Dollars shall be paid before service is reinstated to such delinquent customer, provided, however, if service is reinstated during times other than regular working hours, the Administrative Fee shall be One hundred and Twenty -Five ($125.00) Dollars, and shall be in addition to payment in full for all outstanding monies owned by the delinquent customer, including any late charges or penalties.
SECTION FOUR: That Section 9-1 A-12, Chapter 1 of Title 9 of the Geneva City Code be and the same is hereby amended by substituting the following therefor:
9-1A-12: ELECTRICAL CUSTOMER CONNECTION CHARGE:
As a condition of approval of annexation of land to the city by an annexation agreement; and as a part of such annexation agreement for the development of residential, commercial or industrial land; each owner of such land, his successors and assigns (hereinafter referred to as customer(s)), who requires connection of any residence, building or structure to the city's electrical distribution system, shall pay to the city an electrical connection charge as follows:
Single-family residential buildings or structures, and multi-family residential buildings, per individual dwelling unit
$610.00 Single-family residential buildings and multi-family residential buildings, per individual dwelling unit with 201 amp or greater service
$910.00
General service customers, as defined by this article, per connection
Large general service customers, as defined by this article, per connection:
$1,100.00 For demand usage up to 500 kW
$33.64/kW For demand usage for each connection in excess of 500 kW, but less than 2,000 kW
$33.64/kW Large industrial service customers, as defined by this article, for each connection
$33.64/kW The connection charges, in addition to all other costs imposed by ordinance, shall be paid by the customers as
follows: All residential connection charges shall be paid to the city at the time of the approval of the final plat of
subdivision or approval of a planned development. All nonresidential connection charges shall be paid to the
city at the time of the issuance of a building permit for the building or structure sought to be connected to the
electrical distribution system.
SECTION FIVE: That Chapter 1 of Title 9 of said Geneva City Code as heretofore and hereinabove amended shall otherwise remain in full force and effect.
SECTION SIX: This ordinance shall become effective from and after its passage as in accordance with law and the amended rates shall be applied to all meters read after May 1,2006. Publication of this ordinance is approved to be published in pamphlet form. |