The original item was published from June 21, 2024 2:15 PM to April 1, 2025 12:00 AM
A City contractor will begin surveying water infrastructure the week of June 24 along Anderson Boulevard in Geneva.
HLR is seeking to gain information on existing utilities and structures as part of a future water main and water service replacement project.
No construction activities will be taking place as part of the survey work. The survey will be incorporated into the engineering design in 2025 with construction slated for 2026 or possibly 2027.
For more information, call the Geneva Public Works Department Water Division at 630-232-1551.